Concord Control Systems Ltd. Additional Surveillance Measure (ASM) and Graded Surveillance Measure (GSM) as of Jan 13, 2026

LATEST STATUS
Not active in ASM or GSM
History
Exchange Long/Short Term Stage Entry date Exit date
BSE Long Term ASM Stage I 11 Sep 2025 05 Dec 2025
BSE Short Term ASM Stage I 14 Jun 2024 18 Jul 2024
BSE Short Term ASM Stage I 16 Jan 2024 02 Feb 2024
BSE Short Term ASM Stage I 28 Dec 2023 05 Jan 2024